PRODUCT / Make Ready
Scheduled work still needs to be ready.
Check that work is ready before making a weekly commitment.
Request a demoILLUSTRATIVE DIAGRAM / READINESS
Previous workVerified
MaterialsVerified
CrewVerified
InspectionPending
Make Ready review
Stays in preparation
ON THE PROJECT
A pending approval or unfinished predecessor can leave the crew waiting.
HOW THE WORK HAPPENS
Check the conditions for starting.
Check that no blocking constraints remain.
Verify predecessor work, crew, and required conditions.
If a condition changes, recheck that the work is still ready before release.